NA
Public post
Netham Al-Tarawneh
Sep 2026 • linkedin
Public post
Sep 2026 • linkedin
275 METERS OF ENGINEERING. ⛰️🏗️ Building a 275 m high dam is already a massive challenge. Building it inside a narrow, mountainous valley is a completely different level. Yusufeli Dam in Türkiye is a double-curvature concrete arch dam with: 🔹 275 m height 🔹 558 MW installed capacity 🔹 ~1.89 billion kWh annual energy production 🔹 2.13 billion m³ storage capacity What catches my attention as a civil engineer is the execution. Excavation, access, concrete placement, tunnels, equipment movement and working in ext…
Find the people and context behind this post
Sign up for Super Carl to explore relationship context, warm paths, and relevant opportunities.